Left Hand Square Shower Bath
Regular price
£373.00
inc. VAT
Couldn't load pickup availability
Features & Benefits
- Suitable for use with a bath screen to create a shower enclosure, a perfect space-saving option
- Designed and built to the highest quality
- Sanitary Grade Acrylic
- Un-drilled
- Supplied with leg set
- Bath panels are sold separately
Details
- Guarantee no. of years 5
- Brand Nuie
- Range Square Shower Baths
- Colour White
- Bath Antislip No
- Bath Material Acrylic
- Bath Seat Included No
- Bath Shape Square
- Bath Waste Position End Of Bath
- Combined/Overall Depth 850mm
- Combined/Overall Height 390mm
- Displaced Capacity (L) 130L
- Drilled for Taps Undrilled For Taps
- Embossed Base No
- Includes Grips No Grips Supplied
- Material Thickness 4mm
- Number of Tapholes None
- Product Depth 390mm
- Product Width 850mm
- Volume (Literage) 200L
